Skip to content
FRContact
Roadworks and building

Route d'Essert-Romand: three night closures for resurfacing

Morzine360 editorial teamPublished

As part of safety works on the RD329, route d'Essert-Romand is getting a new road surface in early October.

Morzine valley in summer seen from Avoriaz, village in the valley floor and wooded alpine slopes

As part of safety works on the RD329, route d’Essert-Romand is getting a new road surface in early October. The road is closed to all traffic on the nights of 5, 6 and 7 October, 8pm to 6am, between the RD902 and the Couard bridge, with a detour via the Col de l’Encrenaz. On 7 October, a roughly 100-metre stretch of the RD902 also closes overnight, with a detour through central Morzine and Montriond.

Written by our editorial team from the source cited below, published on 24/09/2026. For any decision (traffic, water use, registration), refer to the official source, which prevails.

Sources

Facts checked against these official or primary sources. Times, prices and conditions change: check before you go. Facts checked on 9 November 2026.

Report an error